السؤال — عربي
لدى منظمة اتفاق مع جهة خارجية لتوفير منشأة تشغيلية كاملة، مماثلة للموقع الأصلي ومُعدة وفقًا لاحتياجات المنظمة، من أجل استعادة القدرة التشغيلية بسرعة في حال وقوع كارثة. أي مما يلي يصف هذا النهج في تخطيط التعافي من الكوارث بشكل أفضل؟
Question — English
An organization has an agreement with a third-party vendor to have a fully operational facility, duplicate of the original site and configured to the organization's needs, in order to quickly recover operational capability in the event of a disaster, which of the following best describes this approach to disaster recovery planning?
الخيارات — عربي
Options — English
💡 A hot recovery plan involves maintaining a fully
operational backup system that can quickly take over
and restore functionality in the event of a disaster. It
allows for minimal downtime and immediate recovery
since the systems and data are already set up and
synchronized.
A cold recovery plan involves setting up a backup system
that is not immediately operational. This requires more
time to configure and get up to speed, leading to longer
downtime compared to a hot recovery plan.